At the end of December 2018 the second work package (“WP2 – Conceptual design of integrated industrial means”) of the IIAMS project has been finished. The main purpose of this work package has been to develop (with a low level of detail) the concept defined in the previous work package (WP1), designing each component of the system in a preliminary state. Representatives of the consortium have reviewed and validated the components and concepts designed. Work package 2 is completed and next work package (WP3) will start at the beginning of the new year (January 2019).
Share this post